4 photosRp 900 jtRp 200 jt / are
Full ocean view land. Location in central Senggigi.*
Senggigi
- 450 m²
Showing 1–18 of 36 properties · page 1 of 2 · all property in Senggigi
4 photosRp 900 jtRp 200 jt / are
Senggigi
8 photos
6 photosRp 750 jtRp 150 jt / are
Senggigi
13 photosRp 1,4 MRp 100 jt / are
Senggigi
7 photosRp 1,63 MRp 125 jt / are
Senggigi
10 photosRp 2,53 MRp 300 jt / are
Senggigi
16 photosRp 750 jtRp 75 jt / are
Senggigi
8 photosRp 1,05 MRp 70 jt / are
Senggigi
14 photosRp 500 jtRp 100 jt / are
Senggigi
5 photosRp 17,5 MRp 350 jt / are
Senggigi
14 photosRp 10,15 MRp 350 jt / are
Senggigi
8 photosRp 1,74 MRp 225 jt / are
Senggigi
8 photosRp 625 jtRp 125 jt / are
Senggigi
7 photosRp 175 jtRp 194,44 jt / are
Senggigi
11 photosRp 4,28 MRp 75 jt / are
Senggigi
11 photosRp 4,11 MRp 79 jt / are
Senggigi
5 photosRp 5,86 MRp 325 jt / are
Senggigi
10 photosRp 4,46 MRp 35 jt / are
Senggigi
Land along this strip has been changing hands since the 1980s, longer than anywhere else on Lombok. That maturity brings formally titled parcels and a functioning market — and it also brings certificates that have passed through several owners, with splits and transfers that were not always registered cleanly.
Kerandangan valley, the slopes towards Malimbu and the ridges above the strip all sell on outlook. Flat, serviced land near the main road is scarcer and behaves differently, because it can take a building without major earthworks.
On beachfront parcels the buildable area is smaller than the certificate area, sometimes considerably. Establish the coastal setback line before you value a plot on total size, because no notary can waive it.
Lanes off the main road were laid out before anyone was delivering concrete. Measure the narrowest point along the route, check whether the right of way is written into the certificate, and drive it once in the wet season if you can.
Utilities are generally already present along this coast, trades are available from Mataram fifteen minutes away, and neighbouring properties give you a real reference for what a build costs here. That is worth something against a cheaper parcel with a two-hour supply line.